Home
It took 4 years for its construction (2001-2005) and has a length of 2.5 Km and a height of 280 m. The bridge's construction cost was about €394 million, with a toll plaza 6 km north of the viaduct costing an additional €20 million!
Subscribe to MumbaiHangOut